Uttar Pradesh has become one of the busiest states under PM Surya Ghar Muft Bijli Yojana, and one big reason is the extra state money. If you live in Varanasi, Lucknow, Prayagraj, Gorakhpur or anywhere in UP, this guide explains what you get, how the money reaches your bank account and what paperwork to keep ready. All figures are indicative as of November 2026; always confirm on the national portal and with UPNEDA (Uttar Pradesh New and Renewable Energy Development Agency).
What is the UP rooftop solar subsidy?
The UP rooftop solar subsidy is a combination of the central government’s Central Financial Assistance (CFA) under PM Surya Ghar and a state top-up paid through UPNEDA to residential consumers who install grid-connected rooftop solar. The central part is the same across most of India. The state part is UP’s own addition, reported in December 2025 as ₹15,000 per kW, capped at ₹30,000 per residential consumer.
Both subsidies are linked to the PM Surya Ghar process. You do not pay a reduced price upfront; you pay the vendor the full system cost (or use a loan), and the subsidy is credited to your bank account after commissioning.
How much subsidy will I get for 1, 2, 3 or 5 kW?
The table below uses the central CFA slabs published on the PM Surya Ghar portal and the indicative UPNEDA top-up. There is some ambiguity in published guides on how the state cap applies above 2 kW, so treat the state column as “up to”.
| System size | Central CFA | UPNEDA top-up (indicative) | Total subsidy (up to) |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹15,000 | ₹45,000 |
| 2 kW | ₹60,000 | ₹30,000 | ₹90,000 |
| 3 kW | ₹78,000 | ₹30,000 | ₹1,08,000 |
| 5 kW | ₹78,000 (capped) | ₹30,000 (capped) | ₹1,08,000 |
| Housing society / RWA common load | ₹18,000/kW, up to 500 kW | Check with UPNEDA | Varies |
Because both subsidies cap out at 3 kW, the subsidy per kW falls sharply for bigger systems. Many UP families still choose 4–5 kW when their bill justifies it, because the extra generation pays back on its own. Use our solar subsidy calculator to run your own numbers.
Who is eligible for the UP solar subsidy?
- A residential electricity connection in your name (or a family member’s, with consent) from a UP DISCOM.
- Your own house with a roof you can legally use. Roughly 10 sq m (about 100 sq ft) of shadow-free area is needed per kW, as noted in UPNEDA’s PM Surya Ghar information sheet.
- No earlier central subsidy claimed for rooftop solar on the same connection.
- Installation using DCR modules on the ALMM list, by a vendor registered on the portal for your DISCOM.
How do I apply? Step-by-step process
- Register on pmsuryaghar.gov.in with your state (Uttar Pradesh), DISCOM (for example PuVVNL in Varanasi), consumer number and mobile number.
- Apply for rooftop solar and choose your capacity. Keep it within your sanctioned load, or apply for a load increase first.
- Get feasibility approval from your DISCOM through the portal.
- Select a registered vendor and sign the agreement. Ask for module datasheets showing DCR status and ALMM listing.
- Installation of modules, inverter, ACDB/DCDB, earthing and lightning arrester.
- Submit installation details and apply for the net meter on the portal.
- Net meter installation and inspection by the DISCOM; the commissioning report is generated online.
- Submit bank details and a cancelled cheque. The central CFA is credited first; the UPNEDA top-up typically follows.
Our detailed walkthrough of the portal is in how to apply for PM Surya Ghar subsidy, and the local DISCOM side is covered in net metering with PuVVNL in Varanasi.
Which documents should I keep ready?
- Latest electricity bill (consumer number, sanctioned load, DISCOM name)
- Aadhaar card and PAN of the applicant
- Proof of ownership or authorisation for the roof (registry, house tax receipt or NOC from co-owners)
- Bank passbook or cancelled cheque in the applicant’s name, with Aadhaar seeding
- Recent passport-size photograph
- Vendor agreement, module and inverter serial numbers, DCR certificate and installation photos (your vendor uploads these)
Most delays in UP come from name mismatches between the bill, Aadhaar and bank account. Fix these before you apply.
What does a system cost in UP after subsidy?
Indicative on-grid prices in 2026 are ₹55,000–70,000 per kW before subsidy, and the ALMM List-II cell rule from 1 June 2026 may add roughly ₹3,000 per kW. For a 3 kW system priced at ₹1,80,000, the combined subsidy of up to ₹1,08,000 brings your net outlay to around ₹72,000. See our rooftop solar cost in Varanasi guide for a size-by-size table. Since 22 September 2025, GST on solar devices is 5%, which already lowered quoted prices.
Can I get a loan for the balance?
Yes. Public sector banks offer collateral-free loans under PM Surya Ghar, reported at around 7% for systems up to 3 kW; confirm the current rate with your bank. You can apply for the loan through the portal. Check monthly payments with our solar EMI calculator or read about solar financing.
- UP homes can combine central CFA (up to ₹78,000) with a UPNEDA top-up (indicatively up to ₹30,000).
- Total support peaks at about ₹1,08,000 for a 3 kW system; larger systems get no extra subsidy.
- Only DCR, ALMM-listed modules installed by a portal-registered vendor qualify.
- Apply once on pmsuryaghar.gov.in; the subsidy is paid after net metering and inspection.
- The scheme runs to 31 March 2027, so plan installation well before then.
SolarEMS is based in Sarnath, Varanasi and designs, supplies and installs rooftop systems across Purvanchal and UP. If you want help sizing your system and preparing a clean subsidy file, request a free quote.
Frequently asked questions
How much solar subsidy can I get in Uttar Pradesh in 2026?
For a residential grid-connected system, the central PM Surya Ghar CFA is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000. UPNEDA has indicatively added ₹15,000 per kW up to ₹30,000. A 3 kW system can therefore receive about ₹1,08,000 in total. Confirm the current state rate with UPNEDA.
Do I need to apply separately to UPNEDA for the state subsidy?
Reports indicate that applying through the PM Surya Ghar national portal is enough and the UP state top-up is processed for eligible residential applicants after the central subsidy. Rules can change, so check the UPNEDA rooftop portal or ask your empanelled vendor to confirm.
Which DISCOMs in UP handle rooftop solar applications?
UP has four distribution companies under UPPCL: PuVVNL (Purvanchal, including Varanasi), MVVNL (Madhyanchal), DVVNL (Dakshinanchal) and PVVNL (Paschimanchal), plus KESCo in Kanpur. Your bill header shows which one serves you, and that DISCOM handles feasibility and net metering.
Can I install any solar panel and still get the UP subsidy?
No. The subsidy requires DCR modules (made with Indian cells) that are on the ALMM list, installed by a vendor registered on the PM Surya Ghar portal for your DISCOM. Non-DCR panels are not eligible.
How long does the UP solar subsidy take to arrive?
The central CFA is credited after commissioning, net-meter installation and inspection are uploaded on the portal, typically within a few weeks of a complete inspection report. The state top-up is usually released after the central amount. Timelines vary with paperwork quality and DISCOM workload.