From Bajardiha and Madanpura to Lohta and the lanes around Sarnath, the Banarasi saree trade runs on thousands of small powerloom and handloom units. Electricity is one of their biggest running costs after yarn and labour. This guide is for weavers, karkhana owners and small MSMEs who want to know whether solar actually pays, how big a system to install and how to finance it. Figures are indicative as of November 2026.
Why does solar suit weaving units?
Looms run during working hours, roughly 9 am to 7 pm, which overlaps with peak solar generation. Self-consumption, meaning using solar power at the moment it is generated, gives the highest value because every unit you use directly replaces a unit you would have bought from the grid at full tariff. That matters for non-domestic connections in UP, where exported surplus may be valued under net billing at a lower rate rather than offsetting imports one-for-one.
Step one: which tariff are you on?
Before anything else, look at your PuVVNL bill category.
- Flat-rate powerloom connection: UP’s Atal Bihari Vajpayee Powerloom Electricity Flat Rate Scheme, approved in April 2023, gives eligible weavers a flat monthly rate, reported for connections up to 5 kW (a proposal to expand it has been reported). If your bill is already low and fixed, solar savings may not justify the cost.
- Metered commercial or industrial connection: you pay per unit plus fixed or demand charges. This is where solar pays best.
- Domestic connection with looms at home: common in older weaving mohallas. Check with PuVVNL whether the usage matches the category before installing.
How much electricity do looms use?
A typical powerloom motor is around 0.5–1 HP, roughly 0.37–0.75 kW, and jacquard attachments, lighting, fans and winding machines add more. Measure actual consumption from your bill or a clamp meter, because motors rarely run at full rating.
| Unit type | Connected load | Approx. units/month | Suggested solar | Indicative cost |
|---|---|---|---|---|
| Handloom unit (lights, fans, winding) | 1–2 kW | 150–250 | 2 kW | ₹1.2–1.4 lakh |
| 4-loom powerloom unit | 3–4 kW | 700–800 | 6 kW | ₹3.3–4 lakh |
| 10-loom powerloom unit | 8–10 kW | 1,800–2,000 | 15 kW | ₹7.5–9 lakh |
| Small finishing / printing MSME | 25–40 kW | 4,000–6,000 | 35–50 kW | ₹15–25 lakh |
Commercial rooftop prices in 2026 are roughly ₹50,000–60,000 per kW for 5–25 kW and ₹40,000–50,000 per kW above 25 kW, with GST on solar devices at 5% since September 2025. These systems do not get PM Surya Ghar subsidy.
How much can a powerloom unit save? A worked example
- Load: 10 looms × 0.75 kW × 10 hours × 26 days ≈ 1,950 units a month.
- Solar: a 15 kW system in Varanasi generates about 1,650–1,900 units a month on average.
- Self-use: because looms run in daytime, around 85–90% of that is used on-site.
- Tariff: at an assumed effective ₹7.5 per unit for a small commercial connection (check your tariff order), savings are about ₹12,000–14,000 a month.
- Payback: on an ₹8 lakh system, that is roughly 5–5.5 years, with 20 or more years of savings after that.
Sundays and festival shutdowns, when looms stop, mean surplus solar is exported. Planning maintenance or winding work on those days improves self-use. Try your own numbers in the solar ROI calculator.
What about load-shedding and voltage drops?
Grid-tied inverters disconnect during outages. If cuts are frequent in your area, consider a hybrid inverter with an LFP battery sized for essential looms, or keep your existing inverter or generator for backup. Low-voltage problems in older lanes can trip inverters; a good installer checks voltage at the site before design.
How can weaving units finance solar?
- Bank term loans for rooftop solar, often with the system itself as security.
- MSME loans with credit guarantee cover, which can reduce collateral needs.
- Green finance lines offered through SIDBI and partner banks for energy efficiency and renewable projects; check current terms.
- RESCO or OPEX model for larger units: no upfront cost, you pay a per-unit tariff. See CAPEX vs OPEX vs RESCO.
Tax benefits such as depreciation may apply to registered businesses; consult your CA, as rules changed with the new Income-tax Act from April 2026. Our solar financing page and EMI calculator help you compare EMI against savings.
What are the rooftop challenges in weaving mohallas?
- Small, shaded roofs between taller buildings: use a shading study and consider elevated structures.
- Old load-bearing roofs: check structural strength before mounting.
- Lint and dust: fabric dust settles on panels; clean every one to two weeks.
- Shared buildings: get written consent from co-owners for roof use.
- Looms run in daylight, so most solar output is used directly, which gives the best savings.
- Check whether you are on UP’s powerloom flat-rate scheme; if so, savings may be limited.
- A 10-loom unit typically needs about 15 kW and can pay back in around five years on metered tariffs.
- Non-residential connections do not get PM Surya Ghar subsidy; use loans or RESCO models.
- Add batteries only if outages genuinely stop production.
SolarEMS is based in Sarnath, close to many of Varanasi’s weaving clusters, and designs solar for commercial and industrial users of every size. Send us a recent bill and loom count and we will size it honestly: get a free quote.
Frequently asked questions
How much solar does a powerloom unit need?
A single powerloom motor is usually around 0.5–1 HP (about 0.37–0.75 kW). A unit with 10 looms running 10 hours a day can use roughly 1,800–2,000 units a month, which a 14–16 kW rooftop system can largely cover in daytime. Measure your actual load before sizing.
Is solar worth it if my powerloom is on the UP flat-rate scheme?
It depends. UP's Atal Bihari Vajpayee Powerloom Electricity Flat Rate Scheme (2023) offers flat-rate billing for small connections, reported as up to 5 kW. If you pay a low flat rate, solar savings may be small. Units above the flat-rate limit, or on metered commercial or industrial tariffs, usually benefit more. Check your bill category first.
Can a weaving unit get PM Surya Ghar subsidy?
PM Surya Ghar subsidy is for residential connections only. If looms run on a separate commercial or industrial connection, that connection is not eligible. Where looms are inside a home on a domestic connection, check with PuVVNL whether that usage is permitted before relying on the subsidy.
What financing is available for solar in small MSMEs?
Options include bank term loans for rooftop solar, MSME loans with credit guarantee cover, green finance lines offered through SIDBI and partner banks, and RESCO or OPEX models where a developer owns the plant and you pay per unit. Terms vary, so compare EMI with your monthly savings.
Will solar run my looms during a power cut?
A standard on-grid system shuts down when the grid fails, for safety. To keep looms running during cuts, you need a hybrid inverter with battery storage or a solar-diesel arrangement, which raises cost. Many units accept on-grid solar for savings and keep existing backup for outages.