Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.
Why it matters
ALMM acts as a quality and origin filter. Manufacturers are listed only after factory inspection and BIS-certified testing, so buyers get panels from verified plants with traceable model numbers. For homeowners, the practical point is simple: if the module is not ALMM-listed, you cannot claim the PM Surya Ghar subsidy. See our explainer on DCR vs non-DCR panels.
How it works in India
| List | Covers | Status (as of 2026) |
|---|---|---|
| List-I | Solar PV modules | In force since 2021 |
| List-II | Solar PV cells | Effective 1 June 2026 |
List-II is widely expected to add around ₹3,000/kW to rooftop costs, because domestic cells cost more than imported ones. Before you sign a quote, ask for the module model number and check it against the current list on the MNRE website. PM Surya Ghar projects also need DCR modules.
Related terms: DCR, CFA, TOPCon. Want an ALMM-compliant quote? Request one here.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
Is ALMM mandatory for rooftop solar subsidy?
Yes. PM Surya Ghar requires DCR modules from ALMM-listed manufacturers installed by a registered vendor; non-listed panels do not qualify for CFA.
What is ALMM List-II?
List-II covers solar cells. From 1 June 2026 projects that need ALMM compliance must use modules built with ALMM-listed cells, which may add roughly ₹3,000/kW to costs.
Related terms
DCR (Domestic Content Requirement)CFA (Central Financial Assistance)TOPCon (Tunnel Oxide Passivated Contact)Mono PERC Solar PanelSolar Panel Degradation