Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.
Why it matters
A home with a 2 kW sanctioned load wanting a 3 kW system may need load enhancement before feasibility approval. Many households in UP and other states have old, low sanctioned loads that no longer match their ACs, geysers and EV chargers, so checking the bill early avoids delays.
How it works in India
| Item | What to check |
|---|---|
| Bill field | “Sanctioned/Contract Load” in kW or kVA |
| Solar limit | State net-metering regulation, often up to sanctioned load |
| Fixed charges | Usually charged per kW of sanctioned load |
| Enhancement | Online DISCOM application + fees |
- Under the Electricity (Rights of Consumers) Rules, net metering is generally allowed up to 500 kW or sanctioned load, whichever is lower; recent amendments relaxed this for small residential systems.
- Exceeding sanctioned load regularly can attract penalties.
- C&I consumers with higher contract demand may also fall under time-of-day tariffs.
State rules differ and change, so confirm with your DISCOM (PuVVNL in Varanasi). Read our net metering guide and PM Surya Ghar application steps, and size your system with the rooftop solar calculator.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
Can my solar system be larger than my sanctioned load?
In many states rooftop capacity is limited to the sanctioned or contract load, though some rules now allow more for small systems. Check your DISCOM's current regulation.
How do I increase my sanctioned load?
Apply to your DISCOM online or at the sub-division office, pay the applicable fees and security deposit; fixed charges on bills may rise.
Related terms
DISCOM (Electricity Distribution Company)Feasibility Approval (Rooftop Solar)Net MeteringkWp (Kilowatt Peak)