PM Surya Ghar: get up to ₹78,000 subsidy on home rooftop solar — scheme open till 31 March 2027 · Check your subsidy →

Solar Company in Varanasi – Rooftop Solar, Panels & Subsidy

Rooftop solar, solar pumps and energy management for Varanasi and Purvanchal — from our base at Sarnath, with PM Surya Ghar, UP state subsidy and PuVVNL net-metering support.

Quick answer: SolarEMS is a solar company based at Sarnath, Varanasi (UP 221007). We design, supply and install rooftop solar for homes, hotels, institutions and MSMEs across Varanasi and Purvanchal. A 3 kW home system costs about ₹1.65–2.0 lakh before subsidy and may receive up to ₹78,000 central CFA plus a UP state top-up (indicatively ₹30,000), with PuVVNL net metering.

Why go solar in Varanasi?

Kashi gets strong sunshine for most of the year. A well-designed rooftop system in Varanasi typically produces about 4.0–4.5 units (kWh) per kW per day, or roughly 1,350–1,550 units per kW each year. With domestic tariffs rising and summer evenings bringing heavy AC loads and occasional power cuts, every unit you generate on your own roof is a unit you do not buy from the grid.

Local conditions matter, though. Summer rooftop temperatures above 45°C reduce panel output by 10–15% (heat derating), the July–September monsoon brings cloudy weeks, and winter haze plus Gangetic plain dust settle on panels. We account for all of this in our design, and recommend cleaning panels every 7–15 days in the dry season.

Who do we install solar for in Varanasi?

  • Homes and villas: on-grid systems for subsidy and net metering, or hybrid systems with lithium batteries for power-cut backup. Residential solar
  • Hotels, guest houses and homestays near the ghats: lower daytime bills from ACs, geysers and kitchens; compact rooftop layouts for tight old-city roofs.
  • Temples, ashrams and dharamshalas: reliable power for lighting, fans, sound systems and water pumping, with bill savings that free up funds for seva.
  • Schools, colleges and hospitals: daytime loads match solar generation closely, giving some of the fastest paybacks. Hospitals often pair solar with battery backup for critical loads.
  • Weaving units and MSMEs: Banarasi saree powerloom units, workshops and small factories cut commercial tariffs under CAPEX or OPEX models. Commercial & industrial solar
  • Farmers in Varanasi district and Purvanchal: solar water pumps and grid-pump solarisation under PM-KUSUM, where farmers typically pay around 40% or less (state rules apply).

How much does rooftop solar cost in Varanasi after subsidy?

The table below is indicative for on-grid residential systems with DCR, ALMM-listed modules (as of late 2026, including 5% GST). Final price depends on roof type, structure height, inverter brand and cable runs.

System size Monthly generation (approx.) Indicative cost before subsidy Central CFA (PM Surya Ghar) UP state top-up (indicative)
1 kW 120–135 units ₹60,000–70,000 ₹30,000 ₹15,000
2 kW 240–270 units ₹1,15,000–1,40,000 ₹60,000 ₹30,000
3 kW 360–400 units ₹1,65,000–2,00,000 ₹78,000 ₹30,000
5 kW 600–670 units ₹2,75,000–3,40,000 ₹78,000 ₹30,000
10 kW 1,200–1,350 units ₹5,50,000–6,50,000 ₹78,000 ₹30,000

Commercial and institutional plants above 25 kW are typically ₹40,000–50,000 per kW and do not receive PM Surya Ghar CFA. Check your own numbers with our solar subsidy calculator.

What subsidy is available in Uttar Pradesh?

Under the PM Surya Ghar Muft Bijli Yojana, residential consumers get central financial assistance of ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, capped at ₹78,000. Housing societies get ₹18,000 per kW for common facilities. The scheme runs to 31 March 2027.

In addition, the UP government, through UPNEDA, has been giving residential consumers a state top-up of ₹15,000 per kW, up to ₹30,000, released after the central subsidy for grid-connected systems installed by an empanelled vendor. That takes the combined support for a 3 kW home to about ₹1,08,000. State amounts and budgets can change, so please confirm the current top-up with UPNEDA or on pmsuryaghar.gov.in before you finalise.

How does net metering work with PuVVNL?

Varanasi is served by Purvanchal Vidyut Vitran Nigam Ltd (PuVVNL), the DISCOM for eastern Uttar Pradesh. The usual process is:

  1. Register on the PM Surya Ghar portal with your PuVVNL consumer number and apply for rooftop solar.
  2. PuVVNL checks technical feasibility (sanctioned load, transformer capacity).
  3. Your empanelled vendor installs the system and uploads details.
  4. PuVVNL installs a bi-directional net meter and inspects the plant.
  5. After commissioning, the subsidy is credited to your bank account.

Timelines vary by division and season, and rules on capacity limits and credit settlement follow UPERC regulations, which can be revised. Read our net metering guide for details. We help with the paperwork at each step.

Which areas around Varanasi do you serve?

From our base at Sarnath, we serve customers in Sarnath, Cantt, Lanka, Sigra, Bhelupur, Shivpur, Pandeypur, Ramnagar, Mughalsarai (Pt. DDU Nagar), Chandauli, Jaunpur, Ghazipur, Mirzapur, Bhadohi and Azamgarh. Outside these, see our service areas page or share your PIN code with us.

How do we design a system for your roof?

  • Load study: we read 12 months of your PuVVNL bills to size the system correctly.
  • Shadow and structure check: old-city roofs often have water tanks, neighbouring buildings and limited space, so layout matters. Plan for about 80–100 sq ft of shadow-free roof per kW.
  • Elevated structures: raised, wind-rated mounting for flat roofs, which also leaves roof space usable.
  • Smart monitoring: our EMS monitoring flags dust losses and faults early, which matters in Varanasi’s dusty, hazy months.

Key takeaways

  • Varanasi rooftops generate about 4.0–4.5 units per kW per day.
  • A 3 kW home system costs roughly ₹1.65–2.0 lakh before subsidy.
  • Central CFA is up to ₹78,000; the UP state top-up has been up to ₹30,000 (confirm with UPNEDA).
  • PuVVNL is the local DISCOM for net metering.
  • Clean panels every 1–2 weeks in dry, dusty months to protect output.

Ready to cut your bill in Varanasi? Request a free site survey and quote. We will size your system, estimate central and UP subsidy, and handle the PuVVNL net-metering paperwork.

Frequently asked questions

How much subsidy can a Varanasi home get for rooftop solar?

Central PM Surya Ghar CFA is up to ₹78,000 for 3 kW and above. Uttar Pradesh has also been giving a state top-up of ₹15,000 per kW up to ₹30,000, so a 3 kW home could receive about ₹1,08,000 in total. Confirm the current state amount with UPNEDA or the national portal before you apply.

Which DISCOM handles net metering in Varanasi?

Varanasi and most of eastern UP are served by Purvanchal Vidyut Vitran Nigam Ltd (PuVVNL). Your net-metering feasibility, meter change and inspection are done by PuVVNL after you apply through the PM Surya Ghar portal.

How many units will a 3 kW system generate in Varanasi?

Varanasi typically gets about 4.0–4.5 units per kW per day, so a 3 kW system produces roughly 12–13 units a day or 360–400 units a month on average, lower in the monsoon and peak-haze weeks and higher from February to May.

Do you serve areas outside Varanasi city?

Yes. From Sarnath we serve customers across Varanasi city and district and nearby Purvanchal districts such as Chandauli, Jaunpur, Ghazipur, Mirzapur, Bhadohi and Azamgarh. Share your PIN code and we will confirm availability.

Can temples, ashrams and schools get PM Surya Ghar subsidy?

PM Surya Ghar CFA is for residential consumers and housing societies. Institutions usually do not get it but still save heavily through lower bills, net metering and 5% GST; some may qualify for separate state or institutional schemes, so check with UPNEDA.

सूर्य की शक्ति, भारत की प्रगति

Get a free site survey & solar quote

Tell us your monthly bill and roof size. Our engineer will design the right system, estimate subsidy and share a transparent quote — no obligation.