2026 brought one of the biggest supply-side changes in Indian solar since ALMM began. The cells inside your modules now matter as much as the module brand. Here is a buyer-focused explanation of what changed, who is affected, and what to check on a quote. This is based on MNRE orders and trade reporting as of November 2026; rules and deadlines have shifted more than once, so confirm the latest MNRE notice before you finalise a purchase.
What is ALMM, and what is List-II?
The Approved List of Models and Manufacturers (ALMM) is MNRE’s register of solar products and factories that are allowed for use in government-linked and regulated projects in India. List-I covers solar PV modules and has been in force for several years. List-II covers solar PV cells. MNRE released List-II in December 2024 and made it effective from 1 June 2026. MNRE has also signalled a future list for wafers.
Which projects does ALMM List-II apply to?
| Project type | Before 1 June 2026 | After 1 June 2026 (as reported) |
|---|---|---|
| Government and scheme projects (incl. PM Surya Ghar, PM-KUSUM) | List-I modules; schemes already needed DCR cells | List-I modules with List-II cells |
| Net-metered rooftop (commercial, industrial) | List-I modules, imported cells allowed | List-II cells required; exemption reported to 31 Dec 2026 |
| Open access projects | List-I modules, imported cells allowed | List-II cells required; exemption reported to 31 Dec 2026 |
| Purely private captive with no regulated linkage | Depends on arrangement | Check applicability with MNRE order |
MNRE has said there will be no blanket extension of the June 2026 date, while allowing case-based relief and the separate net-metering and open access exemption. From 1 January 2027, net-metered and open access projects are expected to need List-II cells unless the timeline changes again.
How does ALMM List-II affect prices?
Indian cell manufacturing capacity is growing fast but has lagged module capacity, as reported by Down To Earth and Mercom. Domestic cells cost more than imported cells, and tight supply adds a premium. Industry estimates suggest rooftop system costs may rise by around ₹3,000 per kW. The table below shows an indicative effect on a typical system.
| System | Indicative cost before | Possible increase | Indicative cost after |
|---|---|---|---|
| 3 kW home (DCR) | ₹1,65,000–2,00,000 | ~₹9,000 | ₹1,74,000–2,09,000 |
| 50 kW commercial rooftop | ₹21–24 lakh | ~₹1.5 lakh | ₹22.5–25.5 lakh |
| 500 kW factory rooftop | ₹2–2.3 crore | ~₹15 lakh | ₹2.15–2.45 crore |
For homes using PM Surya Ghar, the change is smaller because DCR modules were already required, but DCR prices can still move with cell supply. The GST cut to 5% from September 2025 has offset part of the increase; see how the GST cut changed solar prices.
Is ALMM List-II the same as DCR?
DCR (Domestic Content Requirement) means the module uses Indian-made cells, and is required for subsidy schemes such as PM Surya Ghar and PM-KUSUM. ALMM List-II compliance means the cells come from a factory on MNRE’s approved cell list. In practice the two now converge, but the paperwork differs. Read more in DCR vs non-DCR solar panels.
What should buyers check on a quote now?
- Module ALMM List-I entry: the exact model and wattage should appear on the list.
- Cell manufacturer: ask which List-II factory supplied the cells.
- DCR certificate: needed for subsidy claims; it should match module serial numbers.
- Commissioning date: if you rely on an exemption, plan around 31 December 2026 and keep proof of dates.
- Technology: many List-II lines produce TOPCon or mono PERC cells; compare output warranties, not just price.
What does this mean for C&I buyers and EPCs?
Commercial and industrial buyers planning net-metered or open access projects should lock in supply early and check that their EPC has access to List-II cells. Projects that slip past the exemption window may face a higher module bill. Dealers and installers should update quotes, keep compliant inventory and document cell origin. See our C&I solar guide and open access guide.
Is it a good time to buy solar?
For most buyers, yes. Grid tariffs keep rising, the 5% GST rate remains, and a ₹3,000 per kW increase is small compared with 25 years of generation. Waiting for prices to fall may cost more in lost savings than it saves. Run your numbers on the solar ROI calculator.
Why did the government introduce ALMM List-II?
The aim, as stated by MNRE, is to build a complete domestic solar supply chain and reduce dependence on imported cells, much as List-I did for modules. Cells are the most technology-intensive part of a module, and India’s large module assembly capacity was relying heavily on imported cells. By requiring List-II cells in regulated and subsidised projects, the government gives Indian cell factories assured demand, which supports investment in new lines. In the short term this means tighter supply and some price premium; over time, as domestic cell capacity expands, the premium is expected to narrow. For buyers, the practical takeaway is that a reputable supplier with secured cell supply is now more valuable than ever, because delays in cell availability can push commissioning dates past exemption windows.
- ALMM List-II (cells) took effect on 1 June 2026; List-I modules must now use List-II cells in covered projects.
- Net-metering and open access projects got an exemption reported to 31 December 2026.
- Expect roughly ₹3,000 per kW extra on rooftop systems, partly offset by 5% GST.
- Home subsidy buyers see less change because DCR was already required.
- Always ask for ALMM entries, cell supplier and DCR certificates.
SolarEMS supplies ALMM-listed modules and documents cell origin for homes, businesses and trade partners. For a compliant quote, contact us; installers and dealers can explore our dealer and distributor program.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
What is ALMM List-II?
ALMM List-II is the Approved List of Models and Manufacturers for solar PV cells maintained by MNRE. List-I covers modules. From 1 June 2026, projects covered by the ALMM order must use List-I modules made with List-II cells, which in practice means Indian-made cells from approved factories.
Does ALMM List-II apply to rooftop solar on homes?
Home systems under PM Surya Ghar already had to use DCR modules with domestic cells, so the rule changes less for them. The bigger effect is on net-metered commercial rooftops and open access projects, which previously could use imported cells. MNRE extended an exemption for net-metering and open access projects to 31 December 2026, as reported in July 2026.
Will ALMM List-II increase solar panel prices?
Domestic cells cost more than imported ones, and industry estimates suggest the change may add around ₹3,000 per kW to rooftop system costs. The exact impact depends on cell supply, module technology and market conditions, so treat it as indicative.
Is a DCR panel the same as an ALMM List-II compliant panel?
They overlap but are not identical terms. DCR means the module uses domestically manufactured cells, as required for subsidy schemes. An ALMM List-II compliant module is a List-I module built with cells from a List-II manufacturer. A compliant module should be able to support DCR documentation; ask for the cell supplier and certificates.
What should I check before buying panels after the ALMM List-II rule?
Ask for the module's ALMM List-I entry, the cell manufacturer's List-II entry, the DCR certificate if you need subsidy, and the invoice showing model numbers. Confirm your project's commissioning date against the current MNRE exemption timeline.