Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.
Roof type decides more than people expect: the steel you buy, how long the job takes, the wind risk and even the generation. In Indian cities most homes have flat RCC roofs, while factories, godowns, dairies and many shops have tin, GI or colour-coated metal sheet sheds. Here is how the two compare.
What is a solar mounting structure?
A solar mounting structure is the steel or aluminium frame that holds the panels at a fixed angle and transfers their weight and wind force safely into the roof. It is a small part of the bill, usually 8% to 12% of a rooftop system, but most rooftop failures we see in storms start with a weak structure, not a bad panel.
How is solar installed on an RCC roof?
On a flat concrete roof, the installer builds a frame of hot-dip galvanised (HDG) steel or pre-galvanised sections, with legs anchored to the slab. Common options:
- Standard tilted frame: lower edge 0.5 to 1 m high, tilt close to your latitude minus a few degrees (around 20° to 25° in Uttar Pradesh). Fixed with anchor fasteners or chemical anchors, plus PCC blocks where drilling is not wanted.
- Elevated structure: lower edge 2 to 2.5 m high so the roof below stays usable. More steel, so higher cost, and it needs better wind design.
- Ballasted structure: held down by concrete weights with no drilling. Useful when the roof has waterproofing you do not want to disturb, but the slab must take the extra weight.
Your tilt angle and spacing between rows also decide how much shading loss you get in winter, when the sun is low.
How is solar installed on a tin shed or metal roof?
On a sheet roof, panels usually follow the roof slope, a few centimetres above the sheet. The installer uses:
- Rail and L-foot or short rail system: aluminium rails fixed with self-drilling screws into the purlins below.
- Seam clamps: on standing seam or trapezoidal profiles, clamps grip the rib without piercing the sheet in the valley.
- Tilted frame on sheds: only when the slope faces north or is very flat, so the panels need a better angle. This adds weight and wind area.
Before any job on a shed, check the age and gauge of the sheet. A 20-year-old corroded sheet should be replaced first. Panels last 25 years or more, and taking them down later to change the sheet costs time and money.
RCC vs tin shed: side-by-side comparison
| Point | RCC flat roof | Tin / metal sheet shed |
|---|---|---|
| Typical structure | Tilted HDG or pre-GI steel frame | Aluminium rails or seam clamps on purlins |
| Indicative structure cost | ₹4,000–8,000 per kW (standard); ₹8,000–14,000 per kW (elevated) | ₹2,000–4,500 per kW |
| Added dead load | About 20–30 kg/m² with frame | About 15–20 kg/m² |
| Tilt control | Full freedom, can be optimised | Fixed by roof slope and direction |
| Panel cooling | Good air gap, cooler panels | Small gap, panels run a little hotter |
| Main risk | Poor anchoring, slab cracks, waterproofing damage | Leaks, weak purlins, corroded sheets |
| Installation time (10 kW) | 2–4 days | 1–3 days |
Costs are indicative for 2026 and depend on steel prices, height and wind zone. Rates change often, so call us on 8181914448 or fill the form for the latest figure.
What wind speed should the structure handle?
India’s wind code (IS 875 Part 3) splits the country into basic wind speed zones, from about 33 m/s to 55 m/s. Much of Uttar Pradesh is in the 47 m/s zone, while coastal Gujarat, Odisha and Tamil Nadu go higher. A good designer works out uplift for your zone, building height and terrain, then picks section sizes and fastener counts. Ask your installer for the structure drawing and the wind speed it is designed for. If they cannot tell you, that is a warning sign.
How do I prevent leaks on a sheet roof?
- Fix only into purlins, never into the sheet alone.
- Drill on the crest (top) of the corrugation, not in the valley where rainwater runs.
- Use self-drilling screws with EPDM washers, tightened just enough to seal, not crush.
- Apply a compatible sealant over each fixing on old sheets.
- Do a water test before the first monsoon and check again after it.
Which roof gives more generation?
On paper, an RCC roof can give 2% to 5% more yearly units because you can choose the best tilt and face south, and panels run cooler with more air below. A sheet roof facing east-west will lose a little, but you can fit more panels across both slopes. For factories, the much larger shed area usually wins on total output. Check your numbers with the rooftop solar calculator or read our guide on generation losses.
- RCC roofs use a tilted galvanised steel frame; sheds use rails or clamps on purlins.
- Shed mounting is cheaper, roughly ₹2,000–4,500 per kW against ₹4,000–8,000 per kW for a standard RCC frame.
- Elevated RCC structures keep the roof usable but cost more and need careful wind design.
- On sheds, the condition of purlins and sheets matters more than the panel brand.
- Always ask for the design wind speed and a structure drawing.
Not sure what your roof can take? We design structures for both concrete roofs and industrial sheds and can check your site before you commit. Get a free quote, or see our commercial and industrial solar work for shed projects.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
Can solar panels be installed on a tin shed?
Yes. On a tin or metal sheet roof, panels are fixed with rails and clamps that bolt into the purlins below the sheet, or with special clamps for standing seam profiles. The shed's purlins and trusses must be checked for the added load, which is usually about 15 to 20 kg per square metre.
Which is cheaper, solar on RCC roof or on tin shed?
A tin shed installation is usually cheaper because it uses a low-profile rail system with less steel. An RCC roof needs a raised galvanised steel frame, and an elevated structure for using the roof below costs more again.
Will drilling into a tin roof cause leaks?
It can if done poorly. A good installer fixes into purlins only, uses EPDM-washer self-drilling screws or proper sealants, and fixes on the crest of the sheet, not in the valley where water flows.
How high should the solar structure be on an RCC roof?
A standard ground-level frame keeps the lower edge about 0.5 to 1 metre above the roof. An elevated structure raises the lower edge to about 2 to 2.5 metres, so the roof stays usable for drying clothes, water tanks or parking.
#installation#metal roof#mounting structure#rcc roof#tin shed