PM Surya Ghar: get up to ₹78,000 subsidy on home rooftop solar - scheme open till 31 March 2027 · Check your subsidy →
Asansol, West Bengal

Solar Panel Installation in Asansol

Asansol's strong sun and industrial base make it one of West Bengal's best solar markets.

4units per kW per day
~₹7.5avg. home tariff per unit
₹78,000max central subsidy (3 kW+)
WBSEDCL (India Power Corporation Ltd in parts of the Asansol-Raniganj area)local DISCOM
Quick answer: Asansol gets some of the strongest sun in West Bengal, with hot, dry summers. Homes on WBSEDCL or IPCL supply can claim up to ₹78,000 PM Surya Ghar subsidy for 3 kW, and factories in the industrial belt can cut daytime bills with grid-tied solar.

Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.

Asansol sits in the coal and steel belt of Paschim Bardhaman, near Raniganj, Burnpur and Kulti. The area has many MSMEs, workshops, hospitals and schools, plus a large number of independent houses. Western Bengal is drier than Kolkata, so solar output here is a little higher.

Electricity comes from WBSEDCL in most areas and from India Power Corporation Ltd (IPCL) in parts of the Asansol-Raniganj belt. Both handle net metering under WBERC’s 2025 rooftop regulations.

Summer heat can cross 44°C, which lowers panel efficiency a little, so good airflow under the panels helps.

Local tip: coal and road dust build up quickly. Fit an easy water point on the roof so panels can be washed every couple of weeks.

Call or WhatsApp 8181914448, or get a free quote.

Have a question? Ask our solar engineer directly

Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.

Solar in Asansol at a glance

  • Coal and steel industrial belt
  • Hot, dry summers with strong sun
  • Many MSMEs and factories with daytime load

Where we serve around Asansol

How much can a home in Asansol save with solar?

SystemUnits per month (approx.)Bill saving per monthCentral subsidy (homes)Roof area
1 kW120 units₹900₹30,000~90 sq ft
2 kW240 units₹1,800₹60,000~180 sq ft
3 kW360 units₹2,700₹78,000~270 sq ft
5 kW600 units₹4,500₹78,000~450 sq ft
10 kW1,200 units₹9,000₹78,000~900 sq ft

Based on about 4 units per kW per day and an average tariff of about ₹7.5 per unit. Actual output depends on shading, tilt and cleaning.

How much can you save?

Get free site survey

Subsidy and approvals in West Bengal

  • Central subsidy (PM Surya Ghar): ₹30,000 per kW up to 2 kW and ₹18,000 for the 3rd kW, up to ₹78,000. Full guide
  • WBERC's 2025 rooftop solar regulations allow net metering, net billing and gross metering; the state has set a PM Surya Ghar household target and reports mention extra state assistance, so confirm any top-up with your DISCOM or WBREDA.
  • State nodal agency: West Bengal Renewable Energy Development Agency (WBREDA); regulator: West Bengal Electricity Regulatory Commission (WBERC)
  • Net metering is applied through your DISCOM: West Bengal State Electricity Distribution Company Ltd (WBSEDCL): most of the state outside the CESC and IPCL areas, CESC Ltd: Kolkata, Howrah and adjoining parts of North 24 Parganas, South 24 Parganas and Hooghly, India Power Corporation Ltd (IPCL): parts of the Asansol-Raniganj belt in Paschim Bardhaman, Durgapur Projects Ltd (DPL): Durgapur township area, Damodar Valley Corporation (DVC): bulk and some direct supply in parts of the Damodar valley. Net metering guide

Frequently asked questions

Which DISCOM serves Asansol for rooftop solar?

Parts of the Asansol-Raniganj area are served by India Power Corporation Ltd (IPCL) and the rest by WBSEDCL. Your bill shows which one, and both follow WBERC rules.

Does coal dust affect solar panels in Asansol?

Yes, dust from mines and roads lowers output if panels are not cleaned. Regular washing, about every two weeks in the dry season, keeps losses small.

सूर्य की शक्ति, भारत की प्रगति

Planning solar in Asansol?

Send your electricity bill on WhatsApp or book a free site survey. We design the right system, handle DISCOM and subsidy paperwork, and install.