PM Surya Ghar: get up to ₹78,000 subsidy on home rooftop solar - scheme open till 31 March 2027 · Check your subsidy →
Solar panels on a tiled house roof Power-cut backup
For Homes

3 kW Hybrid Solar System with Battery

Solar plus battery backup for homes that want lower bills and power during cuts, with net metering for extra units.

  • Hybrid inverter with built-in MPPT
  • 5 kWh LFP battery, expandable
  • Automatic backup during cuts
  • Exports extra units through net meter
  • App monitoring of solar, battery and grid
  • DCR option for subsidy
PriceIndicative ₹2,40,000–3,30,000 incl. GST (5%) with 5 kWh LFP battery, before subsidy; CFA up to ₹78,000 on eligible grid-connected DCR systems (as of 2026); final price after site survey. Rates change often: call 8181914448 for the latest price.
SKU: SEMS-KIT-HYB3K
Genuine, warranty-backed Pan-India dispatch Installation available

Technical specifications

System size≈3.2–3.3 kWp (6 x 540–550 Wp modules)
ModulesMono PERC/TOPCon; DCR for subsidy
Inverter3–3.6 kW single-phase hybrid, MPPT
Battery5 kWh LFP (48–51.2 V), expandable
Backup≈400–500 W essential load for 7–9 hours
Grid connection230 V single-phase, net meter
Roof area required≈250–300 sq ft shadow-free
Expected generation≈12–15 units/day
ChangeoverAutomatic, typically under 10–20 ms
ProtectionACDB, DCDB, SPD, battery breaker, earthing
Quick answer: A 3 kW hybrid solar system pairs 6 panels with a hybrid inverter and a 5 kWh lithium battery. It makes about 12–15 units a day, exports extras through the net meter and keeps fans, lights and Wi-Fi running for 7–9 hours in a power cut. Indicative price is ₹2,40,000–3,30,000 before subsidy (2026).
Rooftop solar panels in New Delhi Footage: Voice of America (public domain), via Internet Archive

Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.

Who is it for?

Homes in areas with regular cuts, such as many towns in UP, Bihar and Jharkhand, that want to replace an old inverter and battery while cutting the bill. If your supply is steady, the cheaper 3 kW on-grid system may be enough.

Key benefits

  • Backup and savings together: one system replaces the home inverter and lowers the bill.
  • Lithium battery: LFP cells give several thousand cycles and need no water topping.
  • Smart priority: solar first, then battery, then grid.
  • Expandable: add a battery module later if your backup needs grow.

Technical specifications

Specification Typical value
System size ≈3.2–3.3 kWp (6 x 540–550 Wp modules)
Modules Mono PERC/TOPCon; DCR for subsidy
Inverter 3–3.6 kW single-phase hybrid, MPPT
Battery 5 kWh LFP (48–51.2 V), expandable
Backup ≈400–500 W essential load for 7–9 hours
Grid connection 230 V single-phase, net meter
Roof area required ≈250–300 sq ft shadow-free
Expected generation ≈12–15 units/day
Changeover Automatic, typically under 10–20 ms
Protection ACDB, DCDB, SPD, battery breaker, earthing

Installation & warranty

We list the loads you want during cuts, size the battery, and wire a separate backup circuit for them. Installation takes 2–3 days. Typical warranties: 25–30 years on module performance, 5 years on the inverter, and 5–10 years on the LFP battery depending on cycles. Rates change often, so call us on 8181914448 or fill the form for the latest figure. Check backup time with the battery backup calculator.

Key takeaways

  • About 12–15 units a day plus battery backup
  • 5 kWh LFP runs essentials for 7–9 hours
  • Indicative ₹2,40,000–3,30,000 before subsidy
  • Subsidy applies to the solar part on eligible systems

Tired of power cuts? Get a free hybrid system quote sized for your home.

Frequently asked questions

What is the price of a 3 kW hybrid solar system?

Indicatively ₹2,40,000–3,30,000 including GST in 2026 with a 5 kWh lithium battery, before subsidy. A lead-acid battery bank costs less upfront but needs more upkeep and replacement sooner.

Is a hybrid system eligible for PM Surya Ghar subsidy?

Grid-connected systems with DCR panels installed by a registered vendor can claim CFA; many hybrid systems qualify when net metered. The subsidy covers the solar part, not the battery. Confirm on the national portal and with your DISCOM.

How long will the battery run my home?

A 5 kWh LFP battery can run about 400–500 W of fans, lights, TV and Wi-Fi for 7–9 hours. Running an AC or geyser on battery drains it much faster.

Can I add more battery later?

Most hybrid inverters let you add battery modules later, within their limits. Plan this at the start so the inverter and battery voltage match.

You may also need

सूर्य की शक्ति, भारत की प्रगति

Need a complete system, not just a product?

Our engineers will design a matched system - panels, inverter, battery, structure and protection - and install it end-to-end.