Technical specifications
| System size | ≈3.2–3.3 kWp (6 x 540–550 Wp modules) |
|---|---|
| Modules | Mono PERC/TOPCon; DCR for subsidy |
| Inverter | 3–3.6 kW single-phase hybrid, MPPT |
| Battery | 5 kWh LFP (48–51.2 V), expandable |
| Backup | ≈400–500 W essential load for 7–9 hours |
| Grid connection | 230 V single-phase, net meter |
| Roof area required | ≈250–300 sq ft shadow-free |
| Expected generation | ≈12–15 units/day |
| Changeover | Automatic, typically under 10–20 ms |
| Protection | ACDB, DCDB, SPD, battery breaker, earthing |
Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.
Who is it for?
Homes in areas with regular cuts, such as many towns in UP, Bihar and Jharkhand, that want to replace an old inverter and battery while cutting the bill. If your supply is steady, the cheaper 3 kW on-grid system may be enough.
Key benefits
- Backup and savings together: one system replaces the home inverter and lowers the bill.
- Lithium battery: LFP cells give several thousand cycles and need no water topping.
- Smart priority: solar first, then battery, then grid.
- Expandable: add a battery module later if your backup needs grow.
Technical specifications
| Specification | Typical value |
|---|---|
| System size | ≈3.2–3.3 kWp (6 x 540–550 Wp modules) |
| Modules | Mono PERC/TOPCon; DCR for subsidy |
| Inverter | 3–3.6 kW single-phase hybrid, MPPT |
| Battery | 5 kWh LFP (48–51.2 V), expandable |
| Backup | ≈400–500 W essential load for 7–9 hours |
| Grid connection | 230 V single-phase, net meter |
| Roof area required | ≈250–300 sq ft shadow-free |
| Expected generation | ≈12–15 units/day |
| Changeover | Automatic, typically under 10–20 ms |
| Protection | ACDB, DCDB, SPD, battery breaker, earthing |
Installation & warranty
We list the loads you want during cuts, size the battery, and wire a separate backup circuit for them. Installation takes 2–3 days. Typical warranties: 25–30 years on module performance, 5 years on the inverter, and 5–10 years on the LFP battery depending on cycles. Rates change often, so call us on 8181914448 or fill the form for the latest figure. Check backup time with the battery backup calculator.
Key takeaways
- About 12–15 units a day plus battery backup
- 5 kWh LFP runs essentials for 7–9 hours
- Indicative ₹2,40,000–3,30,000 before subsidy
- Subsidy applies to the solar part on eligible systems
Tired of power cuts? Get a free hybrid system quote sized for your home.
Frequently asked questions
What is the price of a 3 kW hybrid solar system?
Indicatively ₹2,40,000–3,30,000 including GST in 2026 with a 5 kWh lithium battery, before subsidy. A lead-acid battery bank costs less upfront but needs more upkeep and replacement sooner.
Is a hybrid system eligible for PM Surya Ghar subsidy?
Grid-connected systems with DCR panels installed by a registered vendor can claim CFA; many hybrid systems qualify when net metered. The subsidy covers the solar part, not the battery. Confirm on the national portal and with your DISCOM.
How long will the battery run my home?
A 5 kWh LFP battery can run about 400–500 W of fans, lights, TV and Wi-Fi for 7–9 hours. Running an AC or geyser on battery drains it much faster.
Can I add more battery later?
Most hybrid inverters let you add battery modules later, within their limits. Plan this at the start so the inverter and battery voltage match.