Technical specifications
| Plant capacity | 50–500 kW (larger on request) |
|---|---|
| Installation type | RCC rooftop, metal-sheet roof, carport, ground-mount |
| Modules | ALMM-listed, BIS-certified mono PERC / TOPCon bifacial |
| Inverters | Three-phase string inverters 20–125 kW |
| Expected generation | ≈4–5 units/kW/day (≈1.3–1.5 lakh kWh/yr per 100 kW) |
| Area required | ≈80–100 sq ft per kW (rooftop) |
| Metering | Net, gross or open access (≥100 kW, as per state rules) |
| Business models | CAPEX, RESCO/OPEX, PPA |
| Monitoring | String-level SCADA / web portal |
| O&M | Cleaning, preventive maintenance, performance reports (AMC) |
Who is it for?
Manufacturing units and MSMEs, warehouses and cold storages, hospitals, schools and colleges, malls, hotels and commercial complexes in states such as Maharashtra, Gujarat, Tamil Nadu, Karnataka, Rajasthan and UP. See our C&I solar page.
What does the EPC scope include?
- Site survey, shadow analysis, load and tariff study
- Structural assessment and wind-load design
- Yield simulation and DC/AC optimisation
- Supply of modules, inverters, structures and BOS
- Liaison for net/gross metering or open access approvals
- Commissioning, monitoring and O&M
Technical specifications
| Specification | Typical value |
|---|---|
| Plant capacity | 50–500 kW (larger on request) |
| Installation type | RCC rooftop, metal-sheet roof, carport, ground-mount |
| Modules | ALMM-listed, BIS-certified mono PERC / TOPCon bifacial |
| Inverters | Three-phase string inverters 20–125 kW |
| Expected generation | ≈4–5 units/kW/day (≈1.3–1.5 lakh kWh/yr per 100 kW) |
| Area required | ≈80–100 sq ft per kW (rooftop) |
| Metering | Net, gross or open access (≥100 kW, as per state rules) |
| Business models | CAPEX, RESCO/OPEX, PPA |
| Monitoring | String-level SCADA / web portal |
| O&M | Cleaning, preventive maintenance, performance reports (AMC) |
Installation & warranty
A typical 100–200 kW rooftop takes about 4–8 weeks from order to commissioning, excluding DISCOM approval time. Modules carry 25–30 year performance warranties and inverters 5–10 years, with plant performance guarantees under O&M contracts. Explore financing options and the ROI calculator.
Key takeaways
- Indicative ₹40,000–50,000 per kW (above 25 kW)
- 100 kW ≈ 1.3–1.5 lakh units a year
- CAPEX, RESCO/OPEX or PPA models
- Consult your CA on depreciation under the new tax rules
Cut your factory’s power bill. get a free quote for a site survey and techno-commercial proposal. EPC partners can join our partner program.
Frequently asked questions
What does a 100 kW commercial solar plant cost?
Indicatively ₹40,000–50,000 per kW, so about ₹40–50 lakh for 100 kW (as of 2026), depending on module type, structure, roof and grid connection. Exact pricing is given after a site survey.
How much energy does a 100 kW plant generate?
About 400–500 units a day, or roughly 1.3–1.5 lakh units a year in most Indian locations.
What is the payback for C&I solar?
With industrial tariffs of about ₹7–10 per unit, payback is often 3–5 years on a CAPEX model. Tax benefits such as depreciation can improve this; consult your CA, as tax rules changed with the new Income-tax Act from April 2026.
Can I go solar without upfront investment?
Yes. Under a RESCO/OPEX or PPA model, a developer owns the plant and you pay a fixed per-unit tariff, usually below the grid tariff, for 15–25 years.
When does open access make sense?
For consumers with 100 kW or more of contract demand under the Green Energy Open Access Rules 2022, open access lets you source solar from an off-site plant. Charges and rules vary by state.