Prices, subsidies and tariffs change from time to time. Call us or fill the form for the latest figures.
Lunglei is the main town of southern Mizoram and is far from the main transmission lines, so supply can be weaker than in Aizawl. Solar on flat roofs lets families reduce bills and, with a battery, keep lights, fans and phones charged during outages.
Schools, churches, health centres and shops in the town have steady daytime loads. Your utility is the Power and Electricity Department, Government of Mizoram.
Practical tip: Transport to Lunglei takes time, so keep a small stock of spare fuses and connectors, and choose an inverter brand with remote monitoring and local service support.
Use the battery backup calculator, see the Mizoram page, or ask for a quote.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Solar in Lunglei at a glance
- Second-largest town in Mizoram
- Remote location, supply can be stretched
- Special category subsidy applies
Where we serve around Lunglei
How much can a home in Lunglei save with solar?
| System | Units per month (approx.) | Bill saving per month | Central subsidy (homes) | Roof area |
|---|---|---|---|---|
| 1 kW | 114 units | ₹680 | ₹33,000 | ~90 sq ft |
| 2 kW | 228 units | ₹1,370 | ₹66,000 | ~180 sq ft |
| 3 kW | 342 units | ₹2,050 | ₹85,800 | ~270 sq ft |
| 5 kW | 570 units | ₹3,420 | ₹85,800 | ~450 sq ft |
| 10 kW | 1,140 units | ₹6,840 | ₹85,800 | ~900 sq ft |
Based on about 3.8 units per kW per day and an average tariff of about ₹6 per unit. Actual output depends on shading, tilt and cleaning.
How much can you save?
Get free site surveySubsidy and approvals in Mizoram
- Central subsidy (PM Surya Ghar): ₹33,000 per kW up to 2 kW and ₹19,800 for the 3rd kW (special category). Full guide
- We found no confirmed separate state top-up for homes as of 2026; Mizoram launched its PM Surya Ghar rollout in December 2024 with bank financing support. Check ZEDA or the Power and Electricity Department for current offers.
- State nodal agency: Zoram Energy Development Agency (ZEDA); regulator: Joint Electricity Regulatory Commission for Manipur and Mizoram (JERC-M&M)
- Net metering is applied through your DISCOM: Power and Electricity Department, Government of Mizoram (entire state). Net metering guide
Frequently asked questions
Should Lunglei homes choose hybrid solar?
If you face regular cuts, yes. A hybrid inverter with a battery keeps essential loads running during outages, while still exporting surplus units through net metering.
Which utility serves Lunglei?
The Power and Electricity Department, Government of Mizoram.