3 kW On-Grid Home Solar System (Surya Ghar kit)

A complete 3 kW rooftop kit with DCR panels, on-grid inverter, structure, protection and paperwork support for PM Surya Ghar subsidy.

  • DCR modules for PM Surya Ghar eligibility
  • Complete kit: panels, inverter, structure, BOS
  • Portal and net-meter paperwork support
  • Wi-Fi generation monitoring
  • Concessional loan options via banks
PriceIndicative ₹1,65,000–2,10,000 before subsidy, incl. GST (5%); about ₹87,000–1,32,000 after ₹78,000 CFA (as of 2026); final price on site survey and quote.
SKU: SEMS-KIT-OG3K
Genuine, warranty-backed Pan-India dispatch Installation available

Technical specifications

System size3.24 kWp (6 x 540 Wp DCR modules)
ModulesDCR, ALMM-listed, BIS-certified mono PERC/TOPCon
Inverter3 kW single-phase on-grid, Wi-Fi monitoring
MountingHot-dip galvanised or aluminium structure, wind-load designed
ProtectionACDB, DCDB, SPDs, earthing and lightning arrester
CablesSolar DC cables (4 mm²) and AC cables as per load
Roof area required≈250–300 sq ft shadow-free
Expected generation≈12–15 units/day (≈3,600–4,500 kWh/year)
Suitable monthly bill≈300–450 units/month consumption
Central subsidy (CFA)₹78,000 (₹85,800 in special category states)
Typical payback≈3–5 years after subsidy
Quick answer: A 3 kW on-grid home solar system uses six DCR panels and a 3 kW inverter to generate about 12–15 units a day, enough for a home using 300–450 units a month. It qualifies for the maximum ₹78,000 PM Surya Ghar subsidy (as of 2026), bringing the indicative net cost to roughly ₹87,000–1,32,000.

Who is it for?

Independent houses and bungalows with monthly bills of ₹2,000–4,500, families wanting to cut bills to near zero under net metering, and homeowners wanting a subsidised, low-maintenance system. It is not suitable if you need backup in power cuts; see the 5 kW hybrid system.

What’s in the kit?

Technical specifications

Specification Typical value
System size 3.24 kWp (6 x 540 Wp DCR modules)
Modules DCR, ALMM-listed, BIS-certified mono PERC/TOPCon
Inverter 3 kW single-phase on-grid, Wi-Fi monitoring
Mounting Hot-dip galvanised or aluminium structure, wind-load designed
Protection ACDB, DCDB, SPDs, earthing and lightning arrester
Cables Solar DC cables (4 mm²) and AC cables as per load
Roof area required ≈250–300 sq ft shadow-free
Expected generation ≈12–15 units/day (≈3,600–4,500 kWh/year)
Suitable monthly bill ≈300–450 units/month consumption
Central subsidy (CFA) ₹78,000 (₹85,800 in special category states)
Typical payback ≈3–5 years after subsidy

Installation & warranty

The process: register on pmsuryaghar.gov.in, get DISCOM feasibility, then we install (usually 1–3 days on site), the DISCOM inspects and fits the net meter, and the subsidy is credited. Typical warranties: 25 years linear on panels, 5–10 years on the inverter, and a workmanship warranty from the installer. Check your numbers with the subsidy calculator or EMI calculator.

Key takeaways

  • 3.24 kWp, about 12–15 units a day
  • Eligible for ₹78,000 CFA with DCR panels
  • Indicative net cost ₹87,000–1,32,000 after subsidy
  • Needs ≈250–300 sq ft of shadow-free roof

Start saving with the PM Surya Ghar subsidy. get a free quote and we will survey your roof and handle the paperwork.

Frequently asked questions

What is the price of a 3 kW solar system after subsidy?

Indicatively ₹1,65,000–2,10,000 before subsidy. After the ₹78,000 central subsidy, the net cost is roughly ₹87,000–1,32,000, plus any state top-up where available. Final cost depends on roof and structure.

How many units does a 3 kW system generate?

About 12–15 units a day, or roughly 3,600–4,500 units a year in most of India, depending on location, tilt and shading.

How much roof space is needed for 3 kW?

Roughly 250–300 sq ft of shadow-free roof.

How long does subsidy credit take?

After installation, DISCOM inspection and net-meter commissioning, the CFA is typically credited to your bank account within about 30 days, though timelines vary by state.

You may also need

सूर्य की शक्ति, भारत की प्रगति

Need a complete system, not just a product?

Our engineers will design a matched system — panels, inverter, battery, structure and protection — and install it end-to-end.