Why it matters
Feasibility approval is the gate between application and installation. Without it you cannot claim CFA or get a net meter. Rejections or delays usually arise from transformer capacity limits, a mismatch with the sanctioned load, name or address errors, or pending dues.
How it works in India
- Register on pmsuryaghar.gov.in with your state, DISCOM and consumer number.
- Apply for rooftop solar with the proposed capacity.
- The DISCOM reviews and issues feasibility approval.
- Choose a registered vendor and install DCR, ALMM-listed equipment.
- Submit installation details; DISCOM inspects and installs the net meter.
- After commissioning, submit bank details; subsidy is credited.
| Common issue | Fix |
|---|---|
| Capacity above sanctioned load | Apply for load enhancement |
| Name mismatch on bill | Correct records with DISCOM |
Rules updated through recent consumer-rights amendments have eased the process for small residential systems, but practice varies by state; in Varanasi the DISCOM is PuVVNL. Follow the steps in how to apply for PM Surya Ghar and our PM Surya Ghar guide. We help with paperwork: get a quote.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
How long does feasibility approval take?
It varies by DISCOM; recent consumer rules aim for quick timelines and deemed approval for small systems if the DISCOM does not respond in time. Check the portal for status.
Can I install before feasibility approval?
For PM Surya Ghar, no. Installing before approval can make you ineligible for subsidy, so wait for the approval on the portal.