Common-area electricity is one of the largest items in a housing society’s maintenance budget. Lifts, water pumps, corridor lights, the clubhouse, STP and security cabins run all day, and are often billed at commercial or bulk tariffs. Rooftop solar on the society’s terraces can cut that bill sharply, and the PM Surya Ghar scheme offers dedicated support for societies and RWAs. Here is how it works.
What subsidy is available for housing societies?
Under PM Surya Ghar Muft Bijli Yojana, Group Housing Societies and Resident Welfare Associations (GHS/RWA) are eligible for ₹18,000 per kW in central financial assistance for rooftop solar serving common facilities, including EV charging, for capacity up to 500 kW. Guidelines link the eligible capacity to the number of houses in the society, so confirm the current limits on pmsuryaghar.gov.in. Like residential systems, society projects must use DCR, ALMM-listed modules and an empanelled vendor. The scheme currently runs until 31 March 2027.
What can society solar power?
- Lifts and fire pumps
- Water supply and booster pumps
- Corridor, parking, street and landscape lighting
- Clubhouse, gym and swimming pool pumps
- Sewage treatment plant (STP)
- Security cabins, CCTV and gates
- Common EV charging points
How much does society solar cost and save?
Society projects are larger than individual homes, so the per-kW price is usually lower. Indicative 2026 figures for on-grid systems:
| System size | Indicative cost before subsidy | CFA at ₹18,000/kW | Indicative net cost | Approx. monthly generation | Approx. annual saving at ₹8/unit |
|---|---|---|---|---|---|
| 20 kW | ₹10,00,000 – ₹12,50,000 | ₹3,60,000 | ₹6,40,000 – ₹8,90,000 | 2,400–3,000 units | ₹2.3 – 2.9 lakh |
| 50 kW | ₹22,00,000 – ₹28,00,000 | ₹9,00,000 | ₹13,00,000 – ₹19,00,000 | 6,000–7,500 units | ₹5.8 – 7.2 lakh |
| 100 kW | ₹42,00,000 – ₹52,00,000 | ₹18,00,000 | ₹24,00,000 – ₹34,00,000 | 12,000–15,000 units | ₹11.5 – 14.4 lakh |
Figures are indicative; actual savings depend on your common-area tariff, shading and how much of the generation is consumed. Many society projects pay back in about 3–5 years. Model your society’s numbers in the solar ROI calculator.
How do you size a society system?
- Collect 12 months of common-area electricity bills and calculate average monthly units.
- Divide by 120–150 to estimate kW (1 kW generates about 4–5 units a day).
- Check usable terrace area: about 80–100 sq ft per kW, avoiding shadows from water tanks, lift rooms and neighbouring towers.
- Check the sanctioned load of the common connection, which typically caps net-metered capacity.
If terraces are limited, elevated structures above lift rooms and tanks, or high-efficiency TOPCon panels, can add capacity.
What is the step-by-step process for an RWA?
- Form a small solar committee to collect bills, roof drawings and quotes.
- Get a technical site survey with shadow analysis and structural assessment.
- Collect quotes from at least two or three empanelled vendors.
- Pass a resolution at a general body meeting or AGM approving the project, budget and vendor, per your bye-laws.
- Apply on the national portal under the GHS/RWA category with the society’s common-area connection details.
- Installation by the chosen vendor, with structural and waterproofing safeguards.
- Net meter application, DISCOM inspection and commissioning. See how net metering works.
- Subsidy credit to the society’s bank account after verification.
How can a society fund the project?
- Sinking or corpus fund: the simplest option if reserves allow.
- One-time member contribution: often recovered within a few years through lower maintenance charges.
- Bank loan: some banks finance society solar projects.
- RESCO / OPEX model: a developer installs and owns the system and the society pays per unit, with no upfront cost. Note that subsidy eligibility under a RESCO model depends on scheme rules.
Compare options in our solar financing guide.
What concerns do members usually raise?
- Roof leakage: a good design uses ballasted or chemically anchored structures and seals every penetration.
- Terrace usage: elevated structures keep space usable for events and drying clothes.
- Maintenance: include cleaning and annual O&M in the contract; see our maintenance guide.
- Safety: proper earthing, lightning protection and restricted access to the array.
Key takeaways
- CFA for societies and RWAs is ₹18,000 per kW for common facilities, up to 500 kW.
- Common-area loads like lifts, pumps and lighting are ideal for daytime solar.
- Payback for society projects is often around 3–5 years.
- A general body resolution and empanelled vendor are essential.
- Scheme runs until 31 March 2027; verify current rules on the national portal.
Planning solar for your society? SolarEMS can prepare a site survey, savings report and AGM-ready proposal. Request a free society solar quote.
Frequently asked questions
How much subsidy do housing societies get for solar?
Under PM Surya Ghar, housing societies and RWAs can get central financial assistance of ₹18,000 per kW for rooftop solar serving common facilities, including EV charging, for capacity up to 500 kW. A per-house capacity limit applies, so check current guidelines on pmsuryaghar.gov.in.
What can society solar power?
Common-area solar typically offsets electricity for lifts, water pumps, corridor and street lighting, clubhouse, gym, security cabins, STP and EV charging points, all billed on the society's common connection.
How much roof area does a society need?
Plan for about 80 to 100 square feet of shadow-free roof per kW. A 50 kW system needs roughly 4,000 to 5,000 square feet, which may be spread across several tower terraces.
Does the society need member approval?
Usually yes. Most societies pass a resolution at a general body meeting or AGM approving the project, budget and vendor, as required by their bye-laws and state cooperative society rules.
Can individual flat owners also get solar?
Flat owners can apply individually under PM Surya Ghar if they have roof access and their own connection, but in apartments, common-area solar is usually more practical. Check your DISCOM's rules on group or virtual net metering, which some states permit.
#common area solar#housing society solar#PM Surya Ghar#RWA solar