Why does a single EPC partner matter?
A solar plant combines structural, electrical, civil, regulatory and IT work. When these are split among several vendors, gaps appear: a structure that does not suit the module size, an inverter that does not match DISCOM settings, or approvals that stall because drawings are incomplete. An EPC partner owns the outcome. You get one contract, one schedule, one point of accountability and a performance estimate the EPC stands behind.
What does our engineering cover?
Good engineering decides 25 years of performance. Our engineering scope includes:
- Site assessment: roof or land survey, drone mapping where useful, shadow analysis, soil investigation for ground-mount, and structural evaluation of existing buildings.
- Energy yield simulation: PVsyst-style modelling with local irradiation, temperature derating (important in Indian summers), soiling and system losses.
- Layout design: module arrangement, tilt and azimuth, row spacing, walkways and fire-access paths.
- Structural design: mounting structures designed for wind zones as per IS 875, with galvanisation or aluminium suited to coastal or industrial environments.
- Electrical design: string sizing, DC/AC cable sizing for low losses, inverter selection, protection coordination, earthing and lightning protection, and single-line diagrams.
- Grid integration: metering arrangement, export limitation, DG synchronisation, and battery integration for hybrid systems.
- Monitoring architecture: SolarEMS data loggers, communication and dashboards.
How do we handle procurement?
Equipment quality is the foundation of long-term returns. We procure from qualified manufacturers and verify compliance before dispatch.
| Component | What we specify and check |
|---|---|
| Solar modules | ALMM-listed; DCR where required; ALMM List-II cell compliance from 1 June 2026 where applicable; mono PERC, TOPCon or bifacial; flash test reports and EL inspection |
| Inverters | BIS certification, grid code compliance, efficiency, MPPT count, monitoring compatibility, local service support |
| Mounting structures | Hot-dip galvanised thickness or aluminium grade, design certification, fasteners in SS |
| Cables and BOS | Solar DC cables to relevant standards, AC cables, SPDs, ACDB/DCDB, isolators, connectors |
| Earthing and lightning | Maintenance-free earthing, ESE or conventional lightning arresters as per design |
| Batteries (if any) | LFP chemistry, BMS, cycle life, warranty terms |
Explore our range on the products page. Note that the GST on solar equipment was reduced to 5% from 22 September 2025, which benefits overall project cost.
How do we manage construction?
- Mobilisation and safety: site safety plan, PPE, fall protection, permit-to-work, and toolbox talks for every crew.
- Civil works: foundations, ballast or anchoring, cable trenches, inverter rooms, and fencing for ground-mount sites.
- Mechanical installation: structure erection, alignment checks and module mounting with correct torque.
- Electrical installation: string wiring, cable laying, termination, distribution boards, earthing and lightning protection.
- Quality control: stage-wise inspection checklists, photographic records and punch-list closure.
- Minimal disruption: phased work and planned shutdowns for live operating facilities.
What liaisoning do we handle?
Approvals are often the slowest part of a solar project. Our liaisoning team prepares and follows up on:
- DISCOM applications for net metering, net billing or gross metering
- Technical feasibility and load sanction or enhancement, where required
- Electrical inspectorate (CEIG) drawing approval and safety inspection for applicable capacities
- Open access and connectivity applications for off-site plants
- PM Surya Ghar portal documentation for residential and RWA projects
- Building or fire department requirements where applicable
Read our net metering guide for an overview of the DISCOM process.
How do we test and commission the plant?
- Visual and mechanical inspection against the design
- Insulation resistance and continuity tests
- String open-circuit voltage and short-circuit current checks
- IV-curve tracing on sample strings and thermal imaging
- Earthing resistance and protection device tests
- Inverter configuration to DISCOM settings and grid synchronisation
- Monitoring activation and performance verification
- Joint inspection with DISCOM or CEIG and meter sealing
How do we manage quality and safety on site?
Every project follows a written quality plan with hold points: structure alignment before module mounting, torque checks before cabling, and insulation tests before energisation. Crews work under permit-to-work and fall-protection rules, and live-plant work is coordinated with your maintenance team to avoid any unplanned shutdown.
What do you receive at handover?
- As-built layout, structural and electrical drawings
- Test reports and commissioning certificate
- Equipment datasheets, warranty cards and serial number lists
- Operation manual and safety instructions
- EMS dashboard access and training for your team
Continue performance management with our O&M and AMC plans.
Which EPC scopes do we offer?
| Scope | Includes | Best for |
|---|---|---|
| Full turnkey EPC | Engineering, procurement, construction, liaisoning, commissioning | Factories, commercial buildings, institutions |
| EPC for developers | Turnkey delivery for RESCO/PPA developers’ projects | Developers and investors |
| Engineering only | Design, simulation, drawings, BOQ | Owners with in-house execution teams |
| Supply plus supervision | Equipment supply with installation supervision | Installers and contractors |
Installers and resellers can partner with us through the dealer and distributor program.
What timelines should you expect?
| Project | Engineering and approvals | Procurement | Construction |
|---|---|---|---|
| Residential (1–10 kW) | 1–3 weeks | Within 1–2 weeks | 1–3 days |
| C&I rooftop (100–500 kW) | 2–6 weeks | 2–4 weeks | 3–6 weeks |
| Ground-mount (1–5 MW) | 1–3 months | 1–2 months | 2–4 months |
Timelines are indicative and depend on site readiness and regulatory approvals.
- EPC gives one accountable partner from design to commissioning.
- Engineering quality drives 25 years of generation.
- Procurement checks cover ALMM, DCR and certification compliance.
- Liaisoning with DISCOM and CEIG is part of our scope.
- Handover includes drawings, test reports and EMS access.
Plan your next solar project with us
Whether you are an owner, developer or installer, we can scope the right EPC package for your project. Request an EPC proposal. See also our commercial and industrial solar offering.
Send your electricity bill or a roof photo on WhatsApp and we will suggest the right system and price.
Frequently asked questions
What does solar EPC mean?
EPC stands for Engineering, Procurement and Construction. A solar EPC contractor designs the plant, buys the equipment, builds it, obtains approvals and commissions it, delivering a working plant to the owner.
What is included in your EPC scope?
Site assessment, detailed design, equipment procurement, civil and electrical works, DISCOM and inspectorate liaisoning, testing, commissioning, documentation and handover, with optional O&M.
How long does a solar EPC project take?
Indicatively 4–8 weeks for a 100–500 kW rooftop project after design approval, and 3–6 months for multi-MW ground-mount plants, excluding regulatory waiting time.
Do you work with developers and other installers?
Yes. We can execute EPC for RESCO developers, provide engineering or supply-only scope, and support installers through our dealer and distributor program.